• ONU-4FE-2V-W EPON 4FE+2POSTS+WIFI ONU
  • Model Number: ONU-4FE-2V-W
  • Brand: SOFTEL
  • MOQ: 1 PCS
 

Product Description                                                               

ONU-4FE-2V-W terminal devices are designed for fulfilling FTTH and triple play service demand of fixed network operators or cable operators. These boxes are based on the mature Gigabit EPON technology, which have high ratio of performance to price, and the technology of 802.11n WiFi (2T2R), Layer 2/3, and high quality VoIP as well. They are highly reliable and easy to maintain, with guaranteed QoS for different service. And they are fully compliant with technical regulations such as IEEE802.3ah and technical requirement of EPON Equipment (V2.1 and above version) from China Telecom. 

 

 
Application Chart

 




Technical Parameters 


Technical item ONU-4FE-2V-WX
PON interface 1EPON Connector,SC single-mode/single-fiber, Symmetric 1.25Gbps
Wavelength Tx1310nm,Rx 1490nm
Optical interface SC connector
Interface 4x 10/100Mbps auto adaptive Ethernet interfaces. 10/100M Full /Half Duplex, RJ45 connectors. 
2x POTS,RJ11 connectors
Wireless Compliant with IEEE802.11b/g/n, 300Mbps, 2T2R one internal antenna and one external antenna
LED 13, For Status of POWERPON LOSWANWIFIPOTSFEPairUSB.
Operating condition -5℃~55℃,10%90%non-condensed
Storing condition -30℃~60℃,10%90%non-condensed
Power supply DC 12V,1/1.5A 
Power consumption ≤10W
Dimension 185mm×135mm×45mmL×W×H
Net weight 0.34Kg


Installation Requirements


Installation Environment Requirements

HGU equipment must be installed in the interior, and to ensure the following conditions:
Confirmation at the HGU installation at sufficient space to facilitate cooling machine.
HGU suitable working temperature of -5 ℃ ~ 55 ℃, humidity 10% to 90%.
Device workplace should avoid radio transmitters, radar stations, and high-frequency interference from power equipment.

Equipment Installation

1.Installed on the desktop

Place the machine on a clean bench, this installation is relatively simple, you can observe the following operation:
-Ensure the smooth workbench.
-Around the device enough space for heat dissipation.

2.Mounted on the wall

Observation HGU equipment chassis two cruciform recess, in accordance with the position of the groove, installed two
screws on the wall.
-The original selected two mounting screws gently snap into recesses aligned.
-Slowly let go, so that the device under the support of the screw hanging on the wall.

1