![]() |
||||||||||||||||||||||||||||
Product Description
|
ONU-4FE-2V-W terminal devices are designed for fulfilling FTTH and triple play service demand of fixed network operators or cable operators. These boxes are based on the mature Gigabit EPON technology, which have high ratio of performance to price, and the technology of 802.11n WiFi (2T2R), Layer 2/3, and high quality VoIP as well. They are highly reliable and easy to maintain, with guaranteed QoS for different service. And they are fully compliant with technical regulations such as IEEE802.3ah and technical requirement of EPON Equipment (V2.1 and above version) from China Telecom. |
Application Chart

Technical Parameters
Technical item | ONU-4FE-2V-WX |
PON interface | 1EPON Connector,SC single-mode/single-fiber, Symmetric 1.25Gbps |
Wavelength | Tx1310nm,Rx 1490nm |
Optical interface | SC connector |
Interface | 4x 10/100Mbps auto adaptive Ethernet interfaces. 10/100M Full /Half Duplex, RJ45 connectors. |
2x POTS,RJ11 connectors | |
Wireless | Compliant with IEEE802.11b/g/n, 300Mbps, 2T2R one internal antenna and one external antenna |
LED | 13, For Status of POWER、PON 、LOS、WAN、WIFI、POTS、FE、Pair、USB. |
Operating condition | -5℃~55℃,10%~90%(non-condensed) |
Storing condition | -30℃~60℃,10%~90%(non-condensed) |
Power supply | DC 12V,1/1.5A |
Power consumption | ≤10W |
Dimension | 185mm×135mm×45mm(L×W×H) |
Net weight | 0.34Kg |
Installation Requirements
Installation Environment Requirements
HGU equipment must be installed in the interior, and to ensure the following conditions:
Confirmation at the HGU installation at sufficient space to facilitate cooling machine.
HGU suitable working temperature of -5 ℃ ~ 55 ℃, humidity 10% to 90%.
Device workplace should avoid radio transmitters, radar stations, and high-frequency interference from power equipment.
Equipment Installation
1.Installed on the desktop
Place the machine on a clean bench, this installation is relatively simple, you can observe the following operation:
-Ensure the smooth workbench.
-Around the device enough space for heat dissipation.
2.Mounted on the wall
Observation HGU equipment chassis two cruciform recess, in accordance with the position of the groove, installed two
screws on the wall.
-The original selected two mounting screws gently snap into recesses aligned.
-Slowly let go, so that the device under the support of the screw hanging on the wall.
1
![]() |